Shottermill Junior School
Kitchen Ventilation and New Bauder Roof
Following the existing tennant vacating the premises our brief and scope of works from the landlord was a fully internal back to base build fit out which included 2 new boilers and flues to include new pipework alterations and replacement of all TRVs and Lockshields to the existing radiators. Total toilet refurbishment, installation of DDA compliant toilets, new lighting and emergency lighting, new carpeting to the 1st floor and epoxy resin flooring to the ground floor, new suspended ceilings, electrical alterations to the main landlord’s supplies and carry out a full periodic test and inspections to BS7671 standard and full decoration throughout
This project was completed under CDM control by our on-site management and supervisory team. Co-ordinating the project to achieve maximum productivity and keeping the program on schedule for the scope of works. With our directly employed team on site we were able to be totally flexible in our approach to a project of this size and were able to adapt to any challenges that arose and resolved them quickly and efficiently without adding any additional time to the completion of this project
The project was completed on time, to budget and to the customers satisfaction and was able to re-marketed by the landlord on the date required
Kitchen Ventilation and New Bauder Roof
KItchen Refurbishment
Boys WC Refurbishment
Swimming Pool Refurbishment
Elmbridge Civic Offices Washroom Refurbishments
Kitchen Refurbishments
New Build Internal Office Fit Out
Internal Redecoration and Flooring
Fire Station Internal and External Refurbishment