Knaphill Junior School

  • Service

    Boys WC Refurbishment

  • Location

    Knaphill Surrey

  • Time Scale

    6 Weeks

  • Budget

    £33k

Projects

Knaphill Junior School

Knaphill Sinks Close UpKnaphill Urinals (2)DSC00726Knaphill Sinks

The Project Brief

The Boys WCs at Knaphill Junior School were totally stripped back to enable the complete refurbishment and to make the area into a bright and clean space.

The waste pipework was altered to suit the layout and the introduction of point of use water heaters, LST radiators and hand dryers along with new flooring, sanitary-ware, taps and lighting.

The colours of the cubicles, vanity units, flooring and walls were chosen by the school to finish the job to their satisfaction.

Our Approach

Following an initial meeting with the client and school representatives all works were carried out within the time frame allowed.

During the completion of this project it was found that the existing hot water services were not up to current standards and this required the addtion of point of use heaters.   This additional unforseen work did not add any extra time to the programme.

The Outcome

This whole project was completed within the time frame allowed and within budget.

Shottermill Complete Kitchen

Shottermill Junior School

Kitchen Ventilation and New Bauder Roof

Shottermill Junior School

  • Service

    Kitchen Ventilation and New Bauder Roof

  • Location

    Haslemere Surrey

  • Time Scale

    10 weeks

  • Budget

    £125k

View Project
The mead complete

The Mead School

KItchen Refurbishment

The Mead School

  • Service

    KItchen Refurbishment

  • Location

    Epsom

  • Time Scale

    8 Weeks

  • Budget

    £85K

View Project
Philip southcote Pool Lighting

Philip Southcote School

Swimming Pool Refurbishment

Philip Southcote School

  • Service

    Swimming Pool Refurbishment

  • Location

    Chertsey

  • Time Scale

    12 Weeks

  • Budget

    £190K

View Project
outside-the-civic-centre Elmbridge

Elmbridge Civic Offices

Elmbridge Civic Offices Washroom Refurbishments

Elmbridge Civic Offices

  • Service

    Elmbridge Civic Offices Washroom Refurbishments

  • Location

    Esher, Surrey

  • Time Scale

    22 weeks

  • Budget

    £250K

View Project
219 Ruth Orange Complete

Ruth House Residential Care Home

Kitchen Refurbishments

Ruth House Residential Care Home

  • Service

    Kitchen Refurbishments

  • Location

    Woking, Surrey

  • Time Scale

    16 weeks

  • Budget

    £145K

View Project
Stockbridge Ground Floor Kitchen

Stockbridge New Build Fit-Out

New Build Internal Office Fit Out

Stockbridge New Build Fit-Out

  • Service

    New Build Internal Office Fit Out

  • Location

    Stockbridge, Hampshire

  • Time Scale

    20 Weeks

  • Budget

    £220K

View Project
Forest View - External 1

Forest View

Internal Redecoration and Flooring

Forest View

  • Service

    Internal Redecoration and Flooring

  • Location

    Basingstoke

  • Time Scale

    4 weeks

  • Budget

    £25K

View Project
Godstone Kitchen 1

Godstone Fire Station

Fire Station Internal and External Refurbishment

Godstone Fire Station

  • Service

    Fire Station Internal and External Refurbishment

  • Location

    Surrey

  • Time Scale

    12 weeks

  • Budget

    £150K

View Project
Front Elevation of Cedarwood 6&7

Cedarwood 6&7

Full M&E Refurbishment and Fit Out Works

Cedarwood 6&7

  • Service

    Full M&E Refurbishment and Fit Out Works

  • Location

    Basingstoke

  • Time Scale

    14 weeks

  • Budget

    £180K

View Project